1 Opening(s)
5.0 Year(s) To 10.0 Year(s)
8.00 LPA TO 10.00 LPA
Designation: Senior Mechanical Design Engineer (Drafting, 3D Modelling & Detailed Engineering)Location: Ahmedabad, IndiaExperience: 5+ Years No Diploma / Only B.Tech / B.E/ M.tech
Job Summary: We are looking for a Senior Mechanical Design Engineer who can manage both design intent and drafting responsibilities. The role requires expertise in preparing detailed engineering drawings, ...
3 Opening(s)
5.0 Year(s) To 8.0 Year(s)
5.00 LPA TO 6.00 LPA
Location: Joka, Kolkata
Qualification: ITI / Diploma (Civil or relevant trade preferred)
Position Overview: We are seeking a skilled and proactive Foreman (Executive Level) to supervise and manage on-site construction activities.
The ideal candidate should have strong practical knowledge, team-handling skills, and hands-on experience in civil/finishing works for residential or commercial projects.
Key Responsibilities:
• ...
1 Opening(s)
5.0 Year(s) To 10.0 Year(s)
8.00 LPA TO 10.00 LPA
We are looking for a Senior Mechanical Design Engineer who can manage both design intent and drafting responsibilities. The role requires expertise in preparing detailed engineering drawings, 3D modelling, skid and plant design, as well as generating deliverables like piping isometrics and BOQs. The selected candidate will ensure that designs ...
1 Opening(s)
3.0 Year(s) To 6.0 Year(s)
6.00 LPA TO 7.00 LPA
Role – QA EngineerResponsibilitiesTest planning activities that involves defining the objectives of testing and the approach for meeting test objectives.Test Strategy – Create a test strategy based on project requirements and schedules.Early testing to eliminate defects at an early stage reduces the bug fixing cost and time.Executing tests with appropriate ...
1 Opening(s)
3.0 Year(s) To 5.0 Year(s)
6.00 LPA TO 7.00 LPA
Responsibilities
Test planning activities that involves defining the objectives of testing and the approach for meeting test objectives.
Test Strategy – Create a test strategy based on project requirements and schedules.
Early testing to eliminate defects at an early stage reduces the bug fixing cost and time.
Executing tests with appropriate techniques (manually ...